翻訳と辞書
Words near each other
・ Revised Code of Washington
・ Revised Common Lectionary
・ Revised Dwikora Cabinet
・ Revised edition of the statutes
・ Revised English Bible
・ Revised European Charter on the Participation of Young People in Local and Regional Life
・ Revised Joint Ministerial Decrees on Construction of Houses of Worship
・ Revised Julian calendar
・ Revised National Tuberculosis Control Program
・ Revised NEO Personality Inventory
・ Reverze
・ Revesand
・ Revesby
・ Revesby Abbey
・ Revesby Heights
Revesby railway station
・ Revesby, Lincolnshire
・ Revesby, New South Wales
・ Revesht
・ Revest-des-Brousses
・ Revest-du-Bion
・ Revest-les-Roches
・ Revest-Saint-Martin
・ Revesz syndrome
・ Revetal
・ Revetment
・ Revetment (aircraft)
・ Revetment (disambiguation)
・ Revett Sheppard
・ RevFM


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Revesby railway station : ウィキペディア英語版
Revesby railway station

Revesby railway station is located on the East Hills line, serving the Sydney suburb of Revesby. It is served by Sydney Trains T2 Airport line services.
==History==

Revesby station opened on 21 December 1931 when the line was extended from Kingsgrove to East Hills. In 1956 a crossing loop was opened.〔(Revesby Station ) NSWrail.net〕〔(Revesby Railway Station Group ) NSW Environment & Heritage〕
On 9 December 1985, the line from Revesby to East Hills was duplicated with a new track laid to the north of the existing one.〔"Signalling & Safeworking" ''Railway Digest'' April 1986 page 119〕 The line from Kingsgrove to Revesby was duplicated around the same time.〔"The East Hills to Glenfield Line" ''Railway Digest'' August 1986 pages 234-235〕
The Rail Clearways Program saw the station's role change significantly, with plans to considerably boost capacity of the East Hills line by creating two centre turnbacks at the station to replace a side turnback at East Hills, and quadruplicating the line from Kingsgrove to Revesby.
In 2006, construction commenced on a second island platform and a replacement footbridge. Platform 3 opened in December 2008, as the main platform to the west. The existing Platform 2 became a centre turnback with only a few services initially using the facility.〔(Airport & East Hills Line timetable changes ) CityRail December 2008〕 In October 2009, a new timetable was introduced, and Revesby replaced East Hills as the major intermediate terminus.
In April 2013, as part of the quadruplication of the line from Kingsgrove to Revesby, Platform 4 opened.〔(Kingsgrove to Revesby Quadruplication Project Profile ) Transport Infrastructure Development Corporation〕

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Revesby railway station」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.